Simplify your online presence. Elevate your brand.

Station Arnhem Central Platforms By Unstudio Hq Architecture

Station Arnhem Central Platforms By Unstudio Hq Architecture
Station Arnhem Central Platforms By Unstudio Hq Architecture

Station Arnhem Central Platforms By Unstudio Hq Architecture Discover the arnhem central masterplan, a transformative urban development by uns. completed in 2015, this vibrant transport hub in arnhem, netherlands, integrates shops, offices, housing, a cinema complex, and seamless connections for six modes of transport. The station is the result of an ambitious 20 year project – master planned by unstudio – to redevelop the wider station area; the largest post war development in arnhem.

Station Arnhem Central Platforms By Unstudio Hq Architecture
Station Arnhem Central Platforms By Unstudio Hq Architecture

Station Arnhem Central Platforms By Unstudio Hq Architecture The elevated footbridge is fully integrated in the design, connecting the different platforms with each other and with the north entrance of the train station. the electrified system has also been integrated into the roof structure, giving a uniform appearance across all platforms. Integrating the naturally sloping landscape distinctive to arnhem, unstudio conceived the transfer terminal as a flowing, utilitarian landscape of different functions stacked up to four storeys above ground and two below. Since 1996 unstudio has collaborated with arup to achieve an integrated design with distinctive architectural and technical concepts for the masterplan, public transport terminal and underground parking. key to the terminal design was a fast and smooth transition between different modes of transport and realising these modes on a very small plot. Arnhem central converts several regional routes and high speed trains to germany. as passenger numbers will continue to grow, the railway infrastructure is being substantially revitalized. on the train station level a new 4th platform will be added and all current platform roofs will be replaced.

Arnhem Central Platform Roofs Arnhem 2011 Unstudio Central
Arnhem Central Platform Roofs Arnhem 2011 Unstudio Central

Arnhem Central Platform Roofs Arnhem 2011 Unstudio Central Since 1996 unstudio has collaborated with arup to achieve an integrated design with distinctive architectural and technical concepts for the masterplan, public transport terminal and underground parking. key to the terminal design was a fast and smooth transition between different modes of transport and realising these modes on a very small plot. Arnhem central converts several regional routes and high speed trains to germany. as passenger numbers will continue to grow, the railway infrastructure is being substantially revitalized. on the train station level a new 4th platform will be added and all current platform roofs will be replaced. Architecture office unstudio drew up the masterplan for the station area and designed the public transport terminal, platforms, office towers and other facilities. bureau b b urbanism and landscape architecture designed the public space, an area of 45 thousand square meters. Ben van berkel of the unstudio architectural firm was chosen to design new plans for the arnhem station. these were finally approved and in 2005 the construction of the new station was finally started. in the meantime, a temporary station was opened 200 meters from the old station. The design is composed of structural spans integrated with large roof lights, adding a sense of brightness and space to the transfer platforms and their surroundings. The new €37.5m (£27.6m) transfer terminal at arnhem central station in the netherlands has now completed. the station is the result of an ambitious 20 year project – master planned by unstudio – to redevelop the wider station area; the largest post war development in arnhem.

Station Arnhem Central Platforms By Unstudio Hq Architecture
Station Arnhem Central Platforms By Unstudio Hq Architecture

Station Arnhem Central Platforms By Unstudio Hq Architecture Architecture office unstudio drew up the masterplan for the station area and designed the public transport terminal, platforms, office towers and other facilities. bureau b b urbanism and landscape architecture designed the public space, an area of 45 thousand square meters. Ben van berkel of the unstudio architectural firm was chosen to design new plans for the arnhem station. these were finally approved and in 2005 the construction of the new station was finally started. in the meantime, a temporary station was opened 200 meters from the old station. The design is composed of structural spans integrated with large roof lights, adding a sense of brightness and space to the transfer platforms and their surroundings. The new €37.5m (£27.6m) transfer terminal at arnhem central station in the netherlands has now completed. the station is the result of an ambitious 20 year project – master planned by unstudio – to redevelop the wider station area; the largest post war development in arnhem.

Arnhem Central Station Arnhem Netherlands Architect Unstudio 2014
Arnhem Central Station Arnhem Netherlands Architect Unstudio 2014

Arnhem Central Station Arnhem Netherlands Architect Unstudio 2014 The design is composed of structural spans integrated with large roof lights, adding a sense of brightness and space to the transfer platforms and their surroundings. The new €37.5m (£27.6m) transfer terminal at arnhem central station in the netherlands has now completed. the station is the result of an ambitious 20 year project – master planned by unstudio – to redevelop the wider station area; the largest post war development in arnhem.

Comments are closed.