Civil Works Boq R1 Pdf Trench
Boq Civil Works Pdf Pdf Concrete Reinforced Concrete This document is a bill of quantities (boq) for civil works for habshan ss 7 & ss 18 switchgear upgrade. it includes quantities, unit rates, and amounts for 21 items related to demolition, removal and reinstatement works along the cable trench route. 4.29 extra for using providing and laying in position ready mixed self compacting concrete(m 30 m 35 grade) work of specified grade of at all level & height, including all leads, lifts, transportation and consumables with cement content as per relevant is codes.
Boq Civil Pdf Foundation Engineering Concrete Providing & hard laying dry stone rubble soling with average 230 mm size filled stone from with small set in regular lines, handpacked and interstices thoroughly outside, compacting chips including with filling iron rammers, in with good quality watering, murum directed sand spreading brought 12mm thk. layer of grit on top etc complete as charge. Rcc trench cover along the boundary wall from transformer & dg to electrical room. the cable trench shall be filled with river sand after laying of cable and rcc trench covers shall be placed in position with adicuate no of pit and properly finished as per instruction of architect site engineer. Unit quantity rate amount earth work in excavation by mechanical means (hydraulic excavator) manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 3.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a . Excavation a) excavate in all materials for trenches, backfill, compact, and dispose of surplus material for pipes: up to and including 400mm diam. for total trench depth: over 0 and up to 1m (li).
Civil And Structural Boq Pdf Power Inverter Trench Unit quantity rate amount earth work in excavation by mechanical means (hydraulic excavator) manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 3.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a . Excavation a) excavate in all materials for trenches, backfill, compact, and dispose of surplus material for pipes: up to and including 400mm diam. for total trench depth: over 0 and up to 1m (li). The document is a bill of quantities for the proposed residence of mr. sivarama krishnan in chennai, detailing various construction works including excavation, concrete, masonry, plastering, and flooring. Civil work estimates for substation this document provides a cost estimate for civil works including foundations, area development, and fencing for an outdoor 11kv 6.6kv substation. This document outlines terms and conditions for civil works. it includes 22 items describing the scope of work, site visits, completion period, payment terms, taxes, utilities, contractor rates and responsibilities, safety compliance, and more. This document appears to be a bill of quantities for concrete work on a construction project. it lists various concrete works like earthwork, plain cement concrete, and reinforced cement concrete for different parts of multiple basement levels, the lower ground floor, and 5 upper levels.
Comments are closed.